Structure the specification in two halves

A form half that fixes the interface and a performance half that lets suppliers propose the construction. Together they stay biddable and comparable.

Acceptance and inspection clauses

Name the inspection method and the acceptance criteria, and require the documentation that proves compliance. Without those clauses, a dispute after delivery becomes a matter of opinion rather than measurement.

Evaluate on cost per mile, and say so

State the basis, the measurement method and the assumptions. Suppliers respond to the criteria they are scored on.

Evaluation criteria that change behaviour

Scoring on acquisition price alone guarantees a price-led market. Adding expected service life, documented inspection and delivery reliability as scored criteria changes what suppliers offer, and it is defensible as long as each criterion is defined.

Tender questions

Should a tender name a brand?

Usually not. Naming a brand limits the market and raises the price without improving the result. Specifying the interface and the duty leaves suppliers free to propose a construction.

State the expected life or duty in the tender, require suppliers to quote against it, and define how it will be measured. Without a defined method the criterion is not enforceable.

Silent substitution of grade or construction, undefined acceptance criteria and unclear warranty terms. All three are preventable in the document.

Fix the interface, describe the performance, and avoid requirements that only one supplier’s catalogue can meet. If only one bid arrives, the specification has effectively named a brand.

Yes. Naming the method and the acceptance criteria turns quality from an expectation into a contract term and gives both sides a way to resolve a disagreement.

Cost per mile and TCO

The model behind the evaluation.

COST PER MILE

Write the specification

The technical document structure.

SPECIFICATION & RFQ

Certifications

Documents a public contract requires.

CERTIFICATIONS

Municipal and contractor

The operational context of a tender.

MUNICIPAL & CONTRACTOR

Ask us to review a tender document

Send the draft and we will flag the clauses that will cause disputes or limit the bidding.

✓ Draft tender or specification
✓ Contract type and duration
✓ Expected volumes
✓ Acceptance and warranty terms

Email: [email protected]

JOMA Blade Quote Form